From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 12:03 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Khaled Reda 

Last updated:  09/06/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Herndon, VA  20171
US

Mobile: 703-622-2779   
Home:
571-299-6195
khaledreda600@hotmail.com
http://www.rde.it/
Contact Preference:  Mobile Phone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Khaled-Resume July 2015.docx

Resume Value: k4hpymmin4cii8e9   

  

 


Khaled Mohamed Reda

11397 Aristotle Drive #307, Fairfax, VA 22030

Khaledreda600@gmail.com  Cell: 571-428-7178

 

Bachelor’s degree in Civil Engineering

Zagazig University, Egypt

July 2001

Page 1

 


Khaled Mohamed Reda

11397 Aristotle Drive #307, Fairfax, VA 22030

Khaledreda600@gmail.com  Cell: 571-428-7178

 

 

 

Page 1

 


 

Certificates

Page 1

 


 

PMI-SP (Scheduling Professional)

Project Management Institute, USA

June 2011

Page 1

 


 

                                                         

Software Proficiency

      Primavera P6 (v8.3):Expert user of Primavera P6 (v.8.3). Extensively used web-based features in P6 Enterprise, as well as local features in P6 Standalone, for various day-to-day tasks, for different employers. Used P6 for creating schedules from scratch, updating current schedules, transforming schedules from MS Project, creating graphical and tabular reports of project progress, creating resource histograms and cash flow projections, analyzing time impact analyses, and controlling security features in P6 for multiple users within same enterprise.

 

MS Office:Expert user of Excel (v.2013). Used Excel for transferring schedules data from and to P6, importing activity lists into schedules, assigning resources and codes to multiple activities, and creating Cash Flow curves.

 

Contract Manager: Familiar with web-based programs such as E-Builder, Primavera Contract Manager, Constructware, Latista for reviewing classified documents and sensitive information such as Contract(s), Cost Estimates, RFPs, PCOs, etc.

 

MS Project: Familiar with MS Project (v.2010) for transforming schedules into Primavera schedules.

 

AutoCAD:               Familiar with AutoCAD (v2009) for drafting sketches, sections and as-built drawings.

 

Professional Experience

Page 1

 


 

TDF, Herndon, VA

(Master Scheduler)

Apr.2014   –   Present

Page 1

 


 

Work within TDF, a construction consulting company, on providing contractors and owners with scheduling services related to delay claims and disputes. Responsibilities on this position include supporting clients in reviewing schedule updates, change orders, TIAs (Time Impact Analysis), REAs (Requests for Equitable Adjustments, and What-If Scenarios. Communicate on a daily basis with client attorneys and project team to provide recommendations regarding scheduling issues and existing claims under disputes. Assist in creating expert reports and presentations to support clients in front of the court.

 

Project:       Dulles Corridor Metrorail Project - Phase II

·                        Client:      Metropolitan Washington Airports Authority (MWAA)

·                        Scope:      Design-Build a new metro line in Virginia.

·                        Location: Herndon, VA.

 

Project:       Taipei New Consular Compound-Phase 2

·                        Client:      American International Contractors Inc. (AICI)

·                        Scope:      Design-Build a US embassy in Taiwan.

·                        Location: Taipei, Taiwan.

 

Page 1

 


 

Insituform, Baltimore, MD

(Project Scheduler)

Dec. 2012 – Apr.2014

Page 1

 


 

http://www.aegion.com/

Worked within the Insituform, a subsidiary company of Aegion Corporation on creating and maintaining schedules of simultaneous multiple projects for rehabilitating the sewer systems in the Baltimore area; creating schedules from scratch, preparing weekly reports, and supporting projects’ teams in using Primavera software in their field tasks.

 

Projects:      Sanitary Contracts #898, #899, #900, #912, #897R

 

Challenges:   Fast pace environment of managing simultaneous different projects with different engineers,  establishing new process to project staff, and supporting project teams on site in documenting and reporting progress of work for schedule updates.

 

Page 1

 


 

Louis Berger Group, Laurel, MD

(Master Scheduler)

Dec. 2011 – Dec. 2012

Page 1

 


 

http://louisberger.com/

Worked within the construction management division of the Louis Berger Group on several projects; creating and maintaining integrated master schedules; evaluating contractors’ schedules and providing support to contractors and consultants in order to submit their Baseline, PCO, TIA and Progress schedules submittals to the Client with the appropriate formats and a sufficient level of details.

Page 1

 


 

 

Project:        Consent Decree

·                        Client:      Washington Suburban Sanitary Commission (WSSC)

·                        Scope:      Rehabilitation of sewer systems.

·                        Location: Laurel, MD            

The project objective is to rehabilitate sewer systems that will extend the life of the aging sewer systems by renewing their pipes in multiple locations in Montgomery and Prince William counties. Responsibilities on this program include incorporating individual project schedules into the IMS (Integrated Master Schedule), maintaining the IMS according to evolving work requirements, resource and cost loading the schedule, and creating progress reports and cash flow projections for multiple project managers. Trained the client managers on the Primavera P6 software  

 

Challenges:                   Immense EPS (Enterprise Projects Structure) with more than 200 Projects, 1,000 WBS and 12,000 Activities constantly evolving according to client’s work requirements.

 

Page 1

 


 

Rizzani De Eccher, Sterling, VA                                                             

(Field Engineer)

Apr. 2010 - Oct. 2011

Page 1

 


 

http://www.rizzanideeccher.com/

Worked within Rizzani De Eccher USA; a branch of an Italian company, that was as subcontractor to the main contractor of the project (Dulles Transit Partners) on the Dulles Corridor Metrorail Plaza project.

Page 1

 


 

 

Project:       Dulles Corridor Metrorail Project - Phase I                                                              

·                        Client:      Metropolitan Washington Airports Authority (MWAA)

·                        Scope:      Build aerial parts of a new metro line.

·                        LocationSterling, VA

The project objective is to construct a new metro line (Silver Line) starting from Tyson Corner till the Dulles Airport in Virginia. Responsibilities on this project include performing quality control, execution inspection, and as-built inspection over the preparation and delivery of pre-cast segments of the aerial portions of the new metro line.

 

Challenges:    Extreme low tolerance, strict client, and an outdoors working environment.

 

Page 1

 


 

Arab Contractors, Middle East

(Civil Engineer)

Feb. 2002 - Dec. 2009

Page 1

 


 

www.arabcont.com/english

Worked within the Arab Contractors company on several projects in various positions through 9 years of employment; creating construction schedules, managing subcontractors work, monitoring cost control, assisting project managers and performing construction inspections.

Page 1

 


 

Project:          Algerian Business Center                          

(Scheduler)

Page 1

 


 

·                        Client:      Bank Natixis-France 

·                        Scope:      Design-Build a commercial building.

·                        Location: Algiers, Algeria      

The project objective is to build a commercial building for the client headquarters in Algeria. Responsibilities on this project included creating the construction schedule and baseline schedules, producing progress reports and payment statements, tracking time and cost variances. Assisted in producing shop and as built drawings.

Page 1

 


 

Project:         Blida Residential Buildings

(Project Engineer)

Page 1

 


 

Project:         Q.T Water Treatment Plant                  

(Field Engineer)

Page 1

 

Khaled Mohamed Reda

11397 Aristotle Drive #307, Fairfax, VA 22030

Khaledreda600@gmail.com  Cell: 571-428-7178

 

Summary of Qualifications

·   Civil Engineer with 13 years of experience in construction management.

·   PMI-SP; certified scheduler within the Project Management Institute (PMI).

·   Proficient user of Primavera P6 scheduling software; Enterprise & Standalone versions.

 

Education

Page 1

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

P6 Scheduler

Insituform Technologies, Inc.

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

None

 

 

Target Job:

Target Job Title:

P6 Scheduler

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-VA-Fairfax/Manassas/Reston

Relocate:

No

Willingness to travel:

Up to 25% travel

 

Languages:

Languages

Proficiency Level

Arabic

Fluent

English

Advanced